Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MAIN DRILL RIG | |
Max Feed Thrust / Feed Pull |
3000KN(674400 lbf) |
Feed Thrust/ Feed Pull System | Pinion and rack type, moving with 6 gears driving with three-speed gear shift, stepless speed regulating I shift : 7.5m/min (24.6 feet/min) II shift : 18m/min (59 feet/min) III shift : 32m/min (105 feet/min) |
Rotation driving | Gear transmission, stepless speed regulating Ishift hollow spindle torque: 98000N@ m(72226 lbf@ ft)@35r/min IIshift hollow spindle torque : 49000N@ m (36113 lbf@ ft)@70r/min |
Motor | |
Manufacturer | Weichai Power Co., Ltd |
Rated Value | 610kW (840HP) |
Operational State | Thrust/Pull and rotation all can reach above mentioned max performance index. |
Operator' s cab | |
Equipped with air-conditioner | |
Dimension and Gross weight | |
Dimension(L× W× H) | 14.5× 3.15× 3m (47.6× 10.3× 9.8 feet) |
Gross weight | 45000kg (99225 lb) |
Mast Entrance Oblique Angle | |
8-16° | |
Environmental Standard and Service | |
Engine emissions and noise meeting European II standard. | |
Drilling Tool | |
Drilling Rod to be used. | 5 " 6 5/8 " |
Reaming shell(cutting type) | 425; 530; 680; 760; 900; 1100; 1350mm (16.7; 20.9; 26.8; 29.9; 35.4; 43.3; 53.1 inch) |
Shackles | |
Clamp holder centering by itself, Shackles full distance moving. | |
Clamper/ Break-out Tong | Distance adjustable with accurate, stable and reliable breaking- out. |
Max make-up torque | 98000N@ m (72226 lbf@ ft) |
Max break out torque | 196000N@ m (144452 lbf@ ft) (It can be designed according to the requirement of client. ) |
Mast of Rig | |
Length of mast 14.8 meters. (48.5 feet) | |
Hydraulic Mud Pump | |
Full Hydraulic driving, flux stepless adjustable. | |
Flux Rate | 0-2200L/min (0-581 US Gallons/min) |
Pressure | 0-10Mpa (0-1450 psi) |
Chassis | |
Track Caterpillar Assembly Type | |
Accessory | |
Pressure, flux rate, and revolution and other more than ten data will be shown in figures. This is easy for analysis and judgment of problems and conditions in the performance process. |